You will not find a list of this fortnight's shipped modules in this post. That is on purpose.
The list already exists. It lives in the changelog and the tracker, and the tracker is computed from our repositories. A post that copied it would be out of date the moment a mark changed. So instead of a summary, here is a way to test any claim of shipped yourself, in a few minutes, across every project.
Start with one changelog entry
The changelog is the record of what changed. Pick one entry from the past fortnight. Note two things: which project it belongs to, and which module it names.
That is your claim. Everything after this step is about checking it.
Find the same module in the tracker
Open the project on Atheron Progress and find the module the entry named. Every module carries one of four marks: shipped, building, next or later.
If the changelog says something shipped, the tracker should show that module as shipped. If it shows building, the entry describes progress, not a ship. Both are honest. They are simply different things, and the mark tells you which one you are looking at.
Ask the one question that matters
Shipped means somebody uses it today. Not finished, not merged, not demonstrated. Used.
So when you see the mark, ask who would be using this module now. If the answer is clear, the mark is doing its job. If you cannot picture anyone, read the changelog entry again. It may describe work that supports a later module rather than something people touch directly.
Read the marks, not the percentage
Each project shows a percentage. Nobody types it. It is counted from the module marks, so the only way the number moves is through the marks underneath it.
That makes the percentage a shortcut, not a source. If you want to know what shipped this fortnight, the marks are the evidence. The number just adds them up.
Read each project on its own terms
The same marks apply everywhere, but each project has its own context.
- Atheron Trading runs on paper only until launch. We publish no performance figures. A shipped mark here is about the software being in use, never about results.
- ATON Blockchain is tracked module by module like the others. Where a module sits behind a public service, the status page adds a second view.
- ATON Desk is coming soon. Read its tracker as a plan, and look to the changelog for any change to it.
- Atheron Network Labs is open for projects. Its modules and marks follow the same rules as everything else.
Shipped and up are separate questions
A module can be shipped and still have a bad day. If what you are checking depends on a public service, open the status page. Each service shows ninety days of history, and each day is coloured by its worst event.
The tracker tells you whether something is in use. The status page tells you how the service behind it has behaved. You need both to get the full picture.
Table: Where to look for each question
| Question | Where to look |
|---|---|
| What changed this fortnight? | The changelog |
| Is that module shipped, building, next or later? | The project's tracker |
| How far along is the project? | The percentage, counted from the marks |
| Has the public service been up? | The status page, ninety days per service |
| What comes after this? | The roadmap |
What this post cannot tell you
We have not listed this fortnight's ships here, and we will not quote numbers from memory. If a fact is not in the changelog or the tracker, it is not something we can stand behind.
The record is public. The changelog and roadmap are the record, and the tracker is computed rather than written. That means you do not have to take our word for what shipped. You can trace it yourself, one line at a time, starting at Atheron Progress.