ATON Kestrel

32.9% of it built.

Kestrel v0.1.0 - A - Tempest is being trained now, and you can watch it live on the ATON Kestrel page. No model is released, none trades real money, and every result is shown as measured, above or below holding. The strategies and weights are private and stay private.

Building2 of 17 shippedHow it was built

Read from the company plan, Nov 24, 2026, 10:50 p.m..

Live

Where the build is

Kestrel v0.1.0 - A - Tempest
  1. Data gatheredNow

    Years of exchange history, turned into examples to learn from.

    since Nov 24

  2. TrainingPlanned

    Three specialists learn, fold by fold.

  3. GatePlanned

    Each must beat simply holding, after fees.

  4. ExamPlanned

    One test on six recent months nobody trained on.

  5. Language modelPlanned

    The model that explains each decision in plain words.

  6. PackagedPlanned

    Release notes and evidence, ready for review.

  7. PublishedPlanned

    Live for members once a founder approves it.

An estimate appears once the first fold is done.

Paper trading only until launch.

Watch the whole build live

Summary

ATON Kestrel has shipped two things so far. Specialists are now trained fold by fold, and backtests are replayed with real fees. The team is now building a scanner, live chart state, the Talon exit engine, a news reader, and plain-word explanations for each decision.

Written automatically from what shipped, and checked against it. Refreshed daily and on every release. Last written November 24, 2026.

Shipped this week

Nothing in this project shipped in the last seven days.

Timeline

Every dated piece and the dates the project works to, as the plan says now, beside what the plan of 7 October said.

  1. Shipped

    Backtests replayed with real fees

    Done September 30, 2026

  2. Shipped

    Specialists trained, fold by fold

    Done October 8, 2026

  3. Shipped

    Training starts on our own graphics card

    Done October 16, 2026

  4. Building

    Kestrel's news reader

    Late: it was due October 23, 2026

  5. Building

    Freeze and control lane

    Late: it was due October 27, 2026

  6. Building

    The record and the shared backtester

    Late: it was due October 30, 2026

  7. Building

    Live chart state

    Late: it was due October 31, 2026

  8. Building

    The scanner

    Late: it was due November 3, 2026

  9. Building

    Three specialists, each judged against holding

    Late: it was due November 6, 2026

  10. Next

    Calibration and the take-the-trade model

    Late: it was due November 9, 2026

  11. Building

    Readers on the chart brief

    Late: it was due November 11, 2026

  12. Building

    Each decision explained in plain words

    Late: it was due November 13, 2026

  13. Next

    Kestrel v0.1.0 - A - Tempest, with its evidence

    Late: it was due November 13, 2026

  14. Building

    Talon exit engine

    Late: it was due November 22, 2026

  15. Today, November 24, 2026
    Next

    A specialist switched on only by its evidence

    Planned for November 27, 2026, on plan

  16. Next

    Leverage and safety caps

    Planned for November 29, 2026, added since 7 October

  17. Next

    Scalp shadow lane

    Planned for November 30, 2026, added since 7 October

  18. Next

    Carry book

    Planned for December 9, 2026, added since 7 October

Modules

Follow this project

Get an email when a piece of it ships. We ask you to confirm first, and every email has a one-click unsubscribe.

Our daily update on Discord and Telegram names what moved.

Ask about this project

Answered only from the company plan, the changelog and these pages, with a link to where each part comes from.

Every project